| Notice the sand being applied to the rail. Earlier Bob fixed that sander and pre-sanded this rail. Morning dew and weeds make for a difficult pull. Especially up a 1% grade with all stone loads. Average sized cut they receive is 60. |
| Date:
9/19/2009 |
Location:
Kent, OH Map  |
Views:
639 |
Collection Of:

Fred Stuckmann |
| Locomotives: |
Author: Fred Stuckmann
|
 |
| Picture Categories: Yard,Action |
This picture is part of album: |