| After tackling the beginning part of the Hill, they start to tackle the last part of it. A BLE Tunnel motor leads two former DM&IR Tunnel Motors with a loaded limestone train | 
	
	
	
		| Date: 
		8/16/2008 | 
		Location: 
		Proctor, MN   Map   | 
		Views: 
		1053 | 
		Collection Of: 
		   
		Eric Bitton | 
	
	
		| Locomotives:    | 
		
			Author:  Eric Bitton
		 | 
	
	
		  | 
	
	
		| Picture Categories: Action | 
		 This picture is part of album:  Twin Ports Railfanning |