| The three-track mainline at College Park awaits the arrival of Capitol Corridor #737, a southbound train scheduled to leave Santa Clara at 1:47 PM on weekends. The train is running behind schedule today, departing Santa Clara at 2:01 PM. College Park is where the triple track mainline passes the Caltrain yards, and swings into San Jose Diridon. The track on the far left is the lead for the yard, and the track on the far right is an alternate siding, while the three main tracks are in the middle. |
| Date:
3/13/2022 |
Location:
San Jose, CA Map  |
Views:
68 |
Collection Of:

Lucas Connor |
|
Author: Lucas Connor
|
 |
| Picture Categories: Station,Track |
This picture is part of album: Restored Album |